【摘 要】
:
5月3日至8日国务院三峡工程筹备领导小组第三次(扩大)会议在京举行。出席会议的除领导小组成员外,还邀请三峡省筹备组及为三峡工程进行筹备的各有关部委、省、市设计科研机
论文部分内容阅读
5月3日至8日国务院三峡工程筹备领导小组第三次(扩大)会议在京举行。出席会议的除领导小组成员外,还邀请三峡省筹备组及为三峡工程进行筹备的各有关部委、省、市设计科研机构、高等院校的专家,负责同志和新闻
From May 3 to May 3, the third (enlarged) meeting of the leading group for the preparation of the Three Gorges Project under the State Council was held in Beijing. In addition to the leading group members who attended the meeting, the preparatory group for the Three Gorges Province and the relevant ministries and commissions for the preparation of the Three Gorges Project as well as the design and scientific research institutes of the provinces and municipalities, experts and institutions of higher learning, responsible comrades and the news
其他文献
一、历史的回顾 长江全长6300余公里,流域面积180万公里~2,年平均迳流量9280亿米~3(在宜昌处为4510亿米~3),落差5400米,其长度居我国之首、世界第三。流域内耕地面积3.65亿
利用重叠多光纤布拉格光栅(FBG)反射谱的时间同步性,实现了动态或静态应变信号的高速传感与解调。给出了基于光纤F—P可调谐滤波器(FFP—TF)的重叠多FBG解调系统及其时域重构的实
根据黄河多沙,下游河道淤积抬升严重,上中游水土保持不可能在短期内大面积生效等情况,提出除当前准备进行的第四期复堤工程以外,在近三五十年内,还要修建小浪底、龙门、军渡(
0、前言0.1本标准是渠道及渠道衬砌委员会编写的,由土木工程学会审定,于1973年4月23日经印度标准协会采用。0.2退水实质上是渠系的安全设施。其作用在于防止渠道可能的破坏,
本文总结了我院水轮机能量试验台的建设和调试情况,从理论上对试验台部分装置的结构问题和测流系统堰上水位波动进行了初步分析,指出解决措施,并指出了尚待改进的方向。
Thi
一、前言水利工程中,建于岩石基础上的护坦板,常加锚筋将其锚固在地基上。加锚筋的主要目的是为了增加护坦板的抗浮稳定性,减少混凝土用量和减少土石方开挖量。其次锚筋还有
DS-10恒定导前时间型准同期装置是浙江省机械科学研究所专为小水电及其出口需要而研制的新型准同期装置。已于1984年1月通过鉴定。它主要适用于500千瓦及以下低压水轮发电机
对单包层掺镱光纤的吸收特性进行了实验研究。分析了抽运光功率、掺杂光纤长度以及种子光功率对单包层掺镱光纤吸收能力的影响。研究发现吸收饱和时,抽运光每增加100mW,掺杂
一、柳河概况及存在问题柳河是辽河中下游左侧的一条多沙支流。柳河上游有两条较大支流:北支名养畜牧河,发源于内蒙库伦旗境内;南支名扣河子河,发源于内蒙奈曼旗境内。南北
“量水建筑物及堰闸测流方法研究”专题协作会于1985年5月22日至29日在安徽省屯溪市召开。参加会议的协作单位有:长办、黄委水文局,云南、四川、湖南、江苏、安徽、江西、河