澄江县罗碧水电站装机1.68万 kW,为南盘江中游河段已建成的第一座水电站,它地处小江断裂构造带西缘,地质情况十分复杂,岩性软弱、结构破碎、地下水活跃,为我院勘测设计电站中罕见。昆明水电勘测设计研究院昆明岩土工程公司承建该电站引水隧洞。在设计院和勘测总队的领导下,由于发挥了设计院水工、施工、科研、地质、测量、施工队的整体技术优势,在隧洞线走向方案决策、各专业密切配合指导施工、摸索出一整套适合本隧洞特点的施工方法,处理了几次塌方事故等方面,表现尤为突出。
The installation of the Luopei Hydropower Station in Chengjiang County is 16,800 kW, which is the first hydropower station built in the middle reaches of the Nanpan River. It is located at the western margin of the Xiaojiang Fault structural belt. The geological conditions are very complicated with weak lithology, fragmented structure and active groundwater. For our hospital survey and design rare in power plants. Kunming Hydropower Design Institute of Kunming Geotechnical Engineering Co., Ltd. construction of the power station diversion tunnel. Under the leadership of the Design Institute and the Survey Corps, due to the overall technical advantages of hydraulic engineering, construction, scientific research, geology, surveying and construction teams of the Design Institute, the project direction has been decided on in the tunnel line and various professions work closely with the guide construction to find a The whole set of construction methods suitable for the characteristics of the tunnel, handling a few landslides and other aspects, the performance is particularly prominent.