龙滩水电站立项前的历程和资金筹集

来源 :水利水电工程造价 | 被引量 : 0次 | 上传用户:pptcowboy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
(一)电站概况龙滩水电站在红水河综合利用规划的10个梯级电站中是关键骨干工程,库容最大,达272亿m~3;装机容量最大,达540万kW。龙滩水电站除本站发电效益外,并可增加下游梯级电站的发电效益;还有防洪、通航等综合利用效益,故俗称“龙头”水电站。 (二)立项前的经历 1981年10月,国家能源委员会和国家计划委员会共同组织召开红水河综合利用规划审查会议。审查报 (I) Overview of Power Plant Longtan Hydropower Station is the key backbone project of 10 cascade hydropower stations in the comprehensive utilization planning of Hongshui River, with the largest storage capacity of 27.2 billion m 3 and the largest installed capacity of 5.4 million kW. Longtan Hydropower Station in addition to generating efficiency of this station, and can increase the downstream cascade hydropower generating benefits; as well as flood control, navigation and other comprehensive utilization benefits, it is commonly known as “leading” hydropower station. (II) Pre-project experience In October 1981, the National Energy Commission and the State Planning Commission jointly organized and held a review meeting on the comprehensive utilization of the Red River. Review Newspaper
其他文献
①四川省川剧学校演出的《九龙屿》。由五年级学生王竹惠飾强从娘。②武安落子是流行在河北省南部、很受群众欢迎的地方小戏。这是邯郸平贾芝霞饰崗秀英。③江苏省京剧团演
目前中国的职业教育正在蓬勃发展,这是中国经济发展的必然结果。首先感谢天津企业管理培养中心张世平院长邀请我来天津参加这次国际职业研讨会,并给与我发表演讲的机会,我感
通过对现阶段与调试项目有关的定额使用情况及适用范围、可逆式抽水蓄能机组启动试验包含项目、抽水蓄能电站与常规水电站、火电站机组调试工作的区别、调试相关定额的适用性
王均同志: 90年4期《语文建设》上登了您的讲话稿,其中提到“国家教委不宜在通过修正案之前,正式推行其他方案,比方说,明令在扫盲或小学教学中使用别种拼音方案”。阅后甚为
各位来宾、同志们、同学们: 新疆语文学校在自治区党政部门领导和有关单位的关心、支持下,经过近两年的筹备,今年正式招生,并于今天正式开学了。这是新疆语文学校第一个开学
2001年7月2日,水利部印发了《关于建立病险水库除险加固责任制的通报》,公布了首批150座全国重要大中型病险水库除险加固责任人名单,并要求各级领导本着对人民生命财产高度
比利时王国位于西欧,南靠法国,北部邻荷兰,东接联帮德国,西与英国隔海相望。国土面积30513平方公里,东西长约200公里,南北宽近150公里,人口985万。(相当于云南省大理州的土
but 一词在英语中使用范围广,词性活跃,词意广泛。一般说来,but 常作连词,表示“但是”、“可是”,用来连接两个意思相对,结构相似的词或句子。但 but 也可表否定。本文试就
由北京曲剧《珍妃泪》改编的戏曲故事片《清宫怨》,最近已在北京拍摄完毕,正进入后期制作,不久即可和观众见面。《清宫怨》一片,以清朝光绪戊戌变法为背景,描写了以西太后为
语言和其它事物一样是在不断发展和变化着的,其主要标志之一就是词语的义变.所谓词语义变是指词语的意义起了变化,即一个词现在的含义与过去的含义不同了,也就是今义与古义