一、钢丝网水泥进、出料吊管法 1.根据病态池的活动盖口及池体尺寸设计钢丝网水泥进、出料吊管(如图1); 2.预制钢丝网水泥圆台形吊管,要求尺寸准确,分层抹水泥砂浆应密实、厚度均匀,外壁涂刷氯丁胶乳沥青,涂料均匀,注意浇水养护,以防砂浆脱水,待具备约70%设计强度后方能安装; 3.从病态池活动盖口插入倒圆台形钢丝网水泥薄壁吊管,并使其上吊于活动盖圈上; 4.用混凝土堵塞原进、出料管和池墙交界处的孔洞,并用水泥砂浆和氯丁胶乳沥青涂料作好接头防水处理; 5.在池顶活动盖周围设置辅助水压间或红泥塑料贮气袋或红泥塑料浮罩以保证必要的贮气量; 6.如原病态池池体高大,需设置二截吊管,以
First, the steel wire mesh into the material hanging pipe method 1. According to the sick pool of the active cover and the size of the pool design steel wire mesh into the material hanging pipe (Figure 1); 2. Prefabricated wire mesh cement round table crane The pipe requires precise dimensions. The layered plaster should be dense and uniform in thickness. The outer wall should be brushed with neoprene asphalt and the paint should be uniform. Pay attention to watering and maintenance to prevent dehydration of the mortar. Only about 70% of the design strength can be installed before installation. Insert the round-faced wire mesh concrete thin wall hanging pipe from the cover of the diseased pool cover and hang it on the movable cover ring; 4. Block the holes at the junction of the original inlet and outlet pipe and the pool wall with concrete and use cement. The mortar and the neoprene latex bituminous coating shall be used for waterproof treatment of joints; 5. Auxiliary water pressure chamber or red mud plastic gas storage bag or red mud plastic floating enclosure shall be installed around the pool top movable cover to ensure the necessary gas storage capacity; The pool pool is tall and it is necessary to set up two hanging pipes to