论文部分内容阅读
斯来纳斯残疾儿童医院新楼包括住院部和门诊部两部分。门诊部1983年建成。住院部1985年5月建成使用。要求它是一个示范性儿童医疗机构,作为长期的或短期的儿科护理和整形外科医院。设计安排适应于儿童患者的特殊要求。医药、物理治疗、休养和教育工作同时并举,同处于一个开朗、明亮、空气充足的环境中。它是个好的居住环境。不仅是一个医疗机关。
The new building of the Sylnas Children’s Hospital includes the inpatient department and the outpatient department. The outpatient department was completed in 1983. The inpatient department was completed and used in May 1985. It is required to be an exemplary child medical institution as a long-term or short-term paediatric care and orthopaedic hospital. The design arrangement is adapted to the special requirements of the child patient. Medicine, physiotherapy, recuperation, and education work together at the same time, in a cheerful, bright and airy environment. It is a good living environment. Not only a medical institution.