为了开展拱坝结构模型试验并结合三峡重力坝进行整体结构模型试验研究工作,1984年上半年笔者在材料结构室设计了一个大型整体结构模型试验台架。该台架由我院实验工厂承包加工,于同年11月中旬完成制造加工任务,经组织有关人员验收,施工质量符合设计要求。台架上部结构布置情况见照片。
In order to carry out the structural model test of arch dam and the experimental study of the overall structure model with the Three Gorges gravity dam, in the first half of 1984, the author designed a large scale structural test bed of the whole structure in the material structure room. The bench contracted by the experimental factory in our hospital, completed the manufacturing and processing tasks in the middle of November of the same year, and was checked and accepted by the relevant personnel. The construction quality conforms to the design requirements. The upper structure of the gantry is shown in the photo.