对水轮机导轴瓦毕托管的改进长沙市水利水电勘测设计院史洪和王家厂水电站安装3台1360kw水轮发电机组,1962年兴建,1963年7月投入生产。水轮机是HL220—LH—126型,圆筒分辩式水导轴瓦,怕冷油润滑。油的循环靠安装在大轴上的甩油盘的旋转产生...
Improvement of Turbine Guide Bush Biotu Tube Installation of 3 sets of 1360kw hydroelectric generating sets was carried out in Changsha City Water Conservancy and Hydropower Survey and Design Institute of Shi Hong and Wangjiashan Hydropower Station, which was built in 1962 and put into production in July 1963. Turbine is HL220-LH-126 type, cylindrical barrel bearing water diversion, fear of cold oil lubrication. The circulation of oil is generated by the rotation of the oil pan which is mounted on the large shaft.