结合随州到岳阳高速公路路面工程第3合同段水泥稳定碎石基层的配合比设计、施工过程,详细介绍水泥稳定碎石的施工工艺。
Based on the mix design and construction process of the cement stabilized macadam base in the 3rd contract section of Pavement Engineering of Suizhou to Yueyang Expressway, the construction process of cement stabilized macadam is introduced in detail.