摘要:土木工程施工是一项复杂的系统工程,涉及多方面的知识和技术,是多种工程技术勘测、设计、施工的成果。影响土木工程的因素既多又复杂,使得土木工程对实践的依赖性很强。现代土建工程以钢筋混凝土施工为主,而钢筋混凝土施工发生的问题点多,本文就针对该问题展开探究。通过实际施工的经验提出一些观点,为类似工程提供有利思考和帮助。
关键词:土木工程;钢筋;混凝土;施工技术;质量问题。
Abstract: The civil engineering construction is a complicated system engineering, involving many aspects of knowledge and technology, is a variety of engineering survey, design, construction work. Influence factors of civil engineering are also more complex, the dependence of the strong civil engineering practice. Modern civil engineering in reinforced concrete construction, reinforced concrete construction the problem points, in this paper, aiming at the problem on. Through the actual construction experience, puts forward some ideas, provide favorable consideration and help for the similar engineering.
Key words: Civil Engineering; reinforced; concrete; construction technology; quality problems
中图分类号:TU74文献标识码:A
随着科学技术的进步和工程实践的发展,土木工程已发展成为内涵广泛、门类众多、结构复杂、 实践性强、涉及知识面广综合性专业。由于土木工程越来越大型化、复杂化,需要解决的根本问题是工程的质量和安全,使结构能够抵抗各种自然或人为的作用力。所以,建筑工程的钢筋混凝土施工质量的好坏, 既影响建筑物结构的安全性, 也对建筑物耐久性、经济性有很大影响。又因建筑工程的钢筋混凝土施工中发生的问题很多, 现结合笔者多年的钢筋混凝土结构施工经验,针对该专业施工中经常遇到的技术质量问题进行阐述分析,供同仁共同探析。
一、钢筋混凝土结构模板施工技术
1、模板施工中易出现的问题
模板是浇筑混凝土的模壳,包括模板和支撑两大部分。模板是使混凝土符合结构构件设计要求的形状、尺寸和空间位置。支撑系统则是保持其位置正确,并承受施工荷载。模板本身不牢固,接缝不严密,就容易引起混凝土漏浆,造成混凝土蜂窝麻面。拆除不规范减弱混凝土的强度。模板位置不正确。模板底部混凝土成形后烂根。模板下口向外爆裂及中部鼓胀损坏模板的稳定性等。
2、解决措施
模板具有足够的强度、刚度和稳定性,能可靠的承受规定的各项施工荷载,并保证变形在允许范围内。模板表面要求平整、光洁、拼缝密合,不漏浆。且竖向模板与内倾模板都必须设置选够的内部撑杆和外部栏杆,以确保模板的稳定性,支架立桩应在两个相垂直的方向加以固定审实。支撑部分必须有足够的支撑面积。安装基土必须坚实,并加垫支撑板。模板拆除时的泥凝土强度应能保证其表面及棱角不受损伤,并使用专门工具以减少混凝土及模板的损坏。根据施工图找出中心线和边线,并弹出边线和外侧控制线,用水准仪根据实际标高直接引测到模板安装位置。
二、钢筋混凝土施工中钢筋技术
1、钢筋进场必须具有产品出厂合格证,并经复检试验,试验报告证明其技术数据符合国家现行技术标准的规定时方可验收,否则严禁使用。钢筋原材料应堆放入仓库或料棚内,并在仓库或场地四周,形成一定排水坡或挖掘排水沟,以利泄水 。钢筋垛下要垫枕木,离地不宜小于 20cm,也可以用钢筋堆放架堆放钢筋,堆放架由多根立柱间隔制成,立柱高度约 1.5m,间距 3m 左右。
2、钢筋的连结可分为绑扎搭接、机械连接或焊接、 机械连接接头和焊接接头的类型及质量应符合国家现行有关标准的规定。受力钢筋的接头宜设置在受力较小处,轴心受拉及小偏心受拉杆件的纵向受力钢筋不得采用绑扎搭接接头,当受拉钢筋的直径d28mm及受压钢筋的直径 d32mm 时,不宜采用绑扎搭接接头。同一构件中相邻纵向受力钢筋的绑扎搭接接头宜相互错开。柱的钢筋绑扎先套柱箍筋,在绑扎搭接竖向受力筋,柱竖向钢筋采用机械或焊接连接时,按规范要求同一断面50%接头位置。梁钢筋绑扎先穿主梁的下部纵向受力钢筋及弯起钢筋,将钢筋按已画好的间距逐个分开。穿次梁的下部纵向受力钢筋及弯起钢筋,并套好箍筋。放主次梁的架力筋,调整箍筋间距使间距符合设计要求,绑架立筋,再绑主筋。次梁上部纵向钢筋放在主梁上部纵向钢筋之上,在主、次梁受力筋下均应垫垫块。板的钢筋绑扎先摆放受力主筋、后方分布筋。在现浇板中有板带梁时,應先绑扎板带梁钢筋,再摆放板钢筋。
三、钢筋混凝土施工工艺
1、搅拌及运输 搅拌混凝土之前,搅拌设备应该加水进行空转,使拌筒充分润湿。配合比要合理,混凝土坍落度过大,成型后孔隙率较大, 易产生麻面。坍落度过小, 施工时混凝土浇筑比较困难。混凝土的运输过程中,混凝土应保持匀质性,不分层、不漏浆、不离析。如果混凝土运达灌筑地点后,出现离析现象,应二次搅拌均匀方可可入模,如出现凝固,则视为废品,不能用于工程施工
2、浇筑
在混凝土浇筑前,应检查模板的标高、位置、尺寸、强度和刚度是否符合要求。清除模板内的杂物和钢筋的油污,对模板的缝隙和孔洞应堵严。在浇筑竖向结构混凝土前,应先在底部填入成分相同的水泥砂浆。浇筑中不得发生离析现象。在混凝土浇筑过程中应经常观察模板、支架、钢筋、预埋件、预留孔洞的情况,当发现有变形、移位时,应及时采取措施进行处理。混凝土浇筑后,混凝土应均匀密实,充满整个模板空间。为保证混凝土的整体性,浇筑混凝土应连续进行。间歇时间宜缩短,并应在前层混凝土凝结前将次层混凝土浇筑完毕。3、施工缝 混凝土的浇筑不能连续进行时,间歇时间需超过混凝土的初凝时间,则应留置施工缝,施工缝的位置应在混凝土浇筑前按设计要求和施工技术方案确定。由于该处新旧混凝土的结合力较差,是结构中的薄弱环节,施工缝宜留置在结构受剪力较小且便于施工的部位。4、捣实 混凝土的捣实就是使入模的混凝土成型与密实的过程,从而保证混凝土结构构件外形正确,表面平整,混凝土的强度和其他性能符合设计的要求。混凝土浇筑入模后应立即进行充分的振捣,使新入模的混凝土充满模板的每一角落,排出气泡,使混凝土拌和物获得最大的密实度和均匀性。
5、混凝土养护技术 混凝土的凝结与硬化是水泥与水产生水化反应的结果。采取一定的工艺措施进行混凝土的养护,为使混凝土中水泥充分水化,加速混凝土的硬化,防止混凝土成型后因曝晒、风吹、干燥、寒冷等自然因素的影响出现不正常的收缩、裂缝破坏等现象。混凝土浇筑完毕后应及时洒水养护保持混凝土表面湿润。
6、混凝土的外观缺陷处理混凝土结构外观的缺陷, 有的破坏结构整体性, 降低构件刚度, 影响结构承载力, 有的虽对承载力无多大影响, 但会引起钢筋锈蚀, 降低耐久性, 或发生渗漏, 影响使用。因此,在不影响建筑物使用功能,可剔凿多余部分, 凿细凿平即可, 不必修补。对面积较大的蜂窝、露石子和露筋处, 应凿去薄弱的砼层和个别凸出的骨料颗粒, 然后选用钢丝刷或加压水冲洗表面, 局部支模, 用比原混凝土强度等级高一级的细骨料混凝土填充, 并认真捣实。四、结束语
综上所述,钢筋混凝土工程的质量, 是对模板、钢筋、混凝土施工工艺等施工全过程的质量控制。每一个环节都必须按照施工技术规范施工, 以确保工程的质量。同时还要了解钢筋混凝土施工常见问题的原因,这样才能采取相应的措施进行解决,是我们的工程项目能够保质保量顺利完工。
备注个人资料:
姓名:侯刚性别:男 出生年:1971年10月7日学历:大学
单位:辽河油田振兴公用事业公司盘锦辽河油田圣泰实业集团有限公司职务:安全员 职称:助理工程师
关键词:土木工程;钢筋;混凝土;施工技术;质量问题。
Abstract: The civil engineering construction is a complicated system engineering, involving many aspects of knowledge and technology, is a variety of engineering survey, design, construction work. Influence factors of civil engineering are also more complex, the dependence of the strong civil engineering practice. Modern civil engineering in reinforced concrete construction, reinforced concrete construction the problem points, in this paper, aiming at the problem on. Through the actual construction experience, puts forward some ideas, provide favorable consideration and help for the similar engineering.
Key words: Civil Engineering; reinforced; concrete; construction technology; quality problems
中图分类号:TU74文献标识码:A
随着科学技术的进步和工程实践的发展,土木工程已发展成为内涵广泛、门类众多、结构复杂、 实践性强、涉及知识面广综合性专业。由于土木工程越来越大型化、复杂化,需要解决的根本问题是工程的质量和安全,使结构能够抵抗各种自然或人为的作用力。所以,建筑工程的钢筋混凝土施工质量的好坏, 既影响建筑物结构的安全性, 也对建筑物耐久性、经济性有很大影响。又因建筑工程的钢筋混凝土施工中发生的问题很多, 现结合笔者多年的钢筋混凝土结构施工经验,针对该专业施工中经常遇到的技术质量问题进行阐述分析,供同仁共同探析。
一、钢筋混凝土结构模板施工技术
1、模板施工中易出现的问题
模板是浇筑混凝土的模壳,包括模板和支撑两大部分。模板是使混凝土符合结构构件设计要求的形状、尺寸和空间位置。支撑系统则是保持其位置正确,并承受施工荷载。模板本身不牢固,接缝不严密,就容易引起混凝土漏浆,造成混凝土蜂窝麻面。拆除不规范减弱混凝土的强度。模板位置不正确。模板底部混凝土成形后烂根。模板下口向外爆裂及中部鼓胀损坏模板的稳定性等。
2、解决措施
模板具有足够的强度、刚度和稳定性,能可靠的承受规定的各项施工荷载,并保证变形在允许范围内。模板表面要求平整、光洁、拼缝密合,不漏浆。且竖向模板与内倾模板都必须设置选够的内部撑杆和外部栏杆,以确保模板的稳定性,支架立桩应在两个相垂直的方向加以固定审实。支撑部分必须有足够的支撑面积。安装基土必须坚实,并加垫支撑板。模板拆除时的泥凝土强度应能保证其表面及棱角不受损伤,并使用专门工具以减少混凝土及模板的损坏。根据施工图找出中心线和边线,并弹出边线和外侧控制线,用水准仪根据实际标高直接引测到模板安装位置。
二、钢筋混凝土施工中钢筋技术
1、钢筋进场必须具有产品出厂合格证,并经复检试验,试验报告证明其技术数据符合国家现行技术标准的规定时方可验收,否则严禁使用。钢筋原材料应堆放入仓库或料棚内,并在仓库或场地四周,形成一定排水坡或挖掘排水沟,以利泄水 。钢筋垛下要垫枕木,离地不宜小于 20cm,也可以用钢筋堆放架堆放钢筋,堆放架由多根立柱间隔制成,立柱高度约 1.5m,间距 3m 左右。
2、钢筋的连结可分为绑扎搭接、机械连接或焊接、 机械连接接头和焊接接头的类型及质量应符合国家现行有关标准的规定。受力钢筋的接头宜设置在受力较小处,轴心受拉及小偏心受拉杆件的纵向受力钢筋不得采用绑扎搭接接头,当受拉钢筋的直径d28mm及受压钢筋的直径 d32mm 时,不宜采用绑扎搭接接头。同一构件中相邻纵向受力钢筋的绑扎搭接接头宜相互错开。柱的钢筋绑扎先套柱箍筋,在绑扎搭接竖向受力筋,柱竖向钢筋采用机械或焊接连接时,按规范要求同一断面50%接头位置。梁钢筋绑扎先穿主梁的下部纵向受力钢筋及弯起钢筋,将钢筋按已画好的间距逐个分开。穿次梁的下部纵向受力钢筋及弯起钢筋,并套好箍筋。放主次梁的架力筋,调整箍筋间距使间距符合设计要求,绑架立筋,再绑主筋。次梁上部纵向钢筋放在主梁上部纵向钢筋之上,在主、次梁受力筋下均应垫垫块。板的钢筋绑扎先摆放受力主筋、后方分布筋。在现浇板中有板带梁时,應先绑扎板带梁钢筋,再摆放板钢筋。
三、钢筋混凝土施工工艺
1、搅拌及运输 搅拌混凝土之前,搅拌设备应该加水进行空转,使拌筒充分润湿。配合比要合理,混凝土坍落度过大,成型后孔隙率较大, 易产生麻面。坍落度过小, 施工时混凝土浇筑比较困难。混凝土的运输过程中,混凝土应保持匀质性,不分层、不漏浆、不离析。如果混凝土运达灌筑地点后,出现离析现象,应二次搅拌均匀方可可入模,如出现凝固,则视为废品,不能用于工程施工
2、浇筑
在混凝土浇筑前,应检查模板的标高、位置、尺寸、强度和刚度是否符合要求。清除模板内的杂物和钢筋的油污,对模板的缝隙和孔洞应堵严。在浇筑竖向结构混凝土前,应先在底部填入成分相同的水泥砂浆。浇筑中不得发生离析现象。在混凝土浇筑过程中应经常观察模板、支架、钢筋、预埋件、预留孔洞的情况,当发现有变形、移位时,应及时采取措施进行处理。混凝土浇筑后,混凝土应均匀密实,充满整个模板空间。为保证混凝土的整体性,浇筑混凝土应连续进行。间歇时间宜缩短,并应在前层混凝土凝结前将次层混凝土浇筑完毕。3、施工缝 混凝土的浇筑不能连续进行时,间歇时间需超过混凝土的初凝时间,则应留置施工缝,施工缝的位置应在混凝土浇筑前按设计要求和施工技术方案确定。由于该处新旧混凝土的结合力较差,是结构中的薄弱环节,施工缝宜留置在结构受剪力较小且便于施工的部位。4、捣实 混凝土的捣实就是使入模的混凝土成型与密实的过程,从而保证混凝土结构构件外形正确,表面平整,混凝土的强度和其他性能符合设计的要求。混凝土浇筑入模后应立即进行充分的振捣,使新入模的混凝土充满模板的每一角落,排出气泡,使混凝土拌和物获得最大的密实度和均匀性。
5、混凝土养护技术 混凝土的凝结与硬化是水泥与水产生水化反应的结果。采取一定的工艺措施进行混凝土的养护,为使混凝土中水泥充分水化,加速混凝土的硬化,防止混凝土成型后因曝晒、风吹、干燥、寒冷等自然因素的影响出现不正常的收缩、裂缝破坏等现象。混凝土浇筑完毕后应及时洒水养护保持混凝土表面湿润。
6、混凝土的外观缺陷处理混凝土结构外观的缺陷, 有的破坏结构整体性, 降低构件刚度, 影响结构承载力, 有的虽对承载力无多大影响, 但会引起钢筋锈蚀, 降低耐久性, 或发生渗漏, 影响使用。因此,在不影响建筑物使用功能,可剔凿多余部分, 凿细凿平即可, 不必修补。对面积较大的蜂窝、露石子和露筋处, 应凿去薄弱的砼层和个别凸出的骨料颗粒, 然后选用钢丝刷或加压水冲洗表面, 局部支模, 用比原混凝土强度等级高一级的细骨料混凝土填充, 并认真捣实。四、结束语
综上所述,钢筋混凝土工程的质量, 是对模板、钢筋、混凝土施工工艺等施工全过程的质量控制。每一个环节都必须按照施工技术规范施工, 以确保工程的质量。同时还要了解钢筋混凝土施工常见问题的原因,这样才能采取相应的措施进行解决,是我们的工程项目能够保质保量顺利完工。