论文部分内容阅读
从美国通用电气公司订购的第二批ND_5型机车(0221~0420~#),从1986年元月底始,陆续到达我国。根据我国的实际运用情况和第一批机车存在的缺陷,双方商定有如下处所做了必要的修改(见MXC85—36204MR合同及其附件)。为了便于检修运用人员了解情况,本文将修改部分介绍如下。 (一)技术条件部分 1.总体布置机车短端宽度尺寸稍有增加;前部了望玻璃加大,前部砂箱适当降低,便于了望;鉴于司机室电风扇风量小且易损坏而改装我国制造的
The second batch of ND_5 locomotives (0221 ~ 0420 ~ #) ordered by General Electric Company from the beginning of January of 1986 successively arrived in our country. According to the actual application in our country and the defects of the first batch of locomotives, the two parties agreed that the necessary modifications (see the MXC85-36204MR contract and their attachments) have been made on the following premises. In order to facilitate the maintenance personnel to understand the situation, this article will modify the part described below. (A) of the technical conditions Part 1. Overall layout A slight increase in the width of the locomotive short-edge dimensions; front look glass to increase the front of the sandbox properly reduced, easy to look; view of the driver room fan small and easy to damage and modified Made in China