论文部分内容阅读
[摘 要] 电力网和电力系统重要的组成部分是高压架空送电线路,对发展国民经济以及人们日常生活有重要作用,更为社会提供了很大的便利。施工质量控制作为施工中的关键的一环,它对统筹建设施工、推动技术进步和优化施工技术管理起到了绝对性的作用。本文首先介绍了高压架空送电线路施工中的质量控制的主要内容以及目的,然后对施工过程中的质量控制措施进行了探讨。
[关键词] 高压架空送电 质量控制 线路施工
High-voltage overhead transmission line construction quality control
Li Zhang
Abstract:The power grid and power system is an important component of high-voltage overhead transmission lines, the development of national economy and people's daily life plays an important role, more community a great convenience. Construction quality control as the key to the construction of a ring, its plans for the building construction, technological advancement and optimization of construction technology management played an absolute role. This paper describes the high-voltage overhead transmission line construction quality control in the main content and purpose, then the construction process of quality control measures were discussed.
Key words:high-voltage overhead power transmission; quality control; line construction
近年来,为了使高压架空送电线路更行之有效的安全运行,相关部门对高压架空送电线路的质量提出了更加严格规范的标准。对于一项具有强专业性、施工的难度大以及施工时周期比较短等特点的繁杂的系统工程,其要求十分苛刻。高压架空送电线路施工过程包括以下几个部分:首先是施工的测量工程和土石方工程,其次是基础工程和杆塔工程,最后是架线工程和接地工程。在每个工程阶段,必须用规范有效的方法进行质量控制,使在很好的完成施工全过程的同时达到预期的质量效果。
一、高压架空送电线路施工中的质量控制的主要内容和目的
1、高压架空送电线路施工中的质量控制的主要内容
1)对施工图纸的会同审查并进行技术上的交底。施工队按照设计图纸进行施工,因此在开工之前各相关部门对设计图纸进行解读,并且从图纸上了解与施工有关的有效信息是必不可少的步骤。同时也可以从设计、结构选型以及施工现场等是否满足施工需要来补充并完善设计图纸。
2)对施工组织设计和施工方案严格按照一定标准进行审核。施工组织设计是对施工活动能够实行科学管理的重要手段,它从施工的各方面来指导施工的具体活动,从使施工脚步加快了,也节约了一些施工时间,更提高了经济的效益。另外它还包含了基本建设计划以及其要求,各阶段的工作内容也详尽的写在其中。铺设电力线路,由于周围环境因素,经常需要进行跨越障碍物工作。跨越施工能否安全顺利的进行,不仅关系到整个电力线路铺设工程的进度,而且会影响到相关地区的生产生活,意义重大。本文通过分析电力线路的跨越工程安全隐患的分析,为实现最大限度的降低跨越施工的危险系数提出应对之策。
电力线路在铺设过程中,常常会遇到各种各样影响电力线路铺设工程的障碍物,这就需要通过搭设跨越架等方式进行障碍物的跨越施工。现实的电力线路作业中遇到的障碍物通常是通讯线路、公路或是地势环境恶劣的山区等,由此展开的电力线路跨越工程难度之大,危险系数之高可见一斑。大截面导线施工的设备需求量很大,有时还需采用特殊设备,牵引机及牵引绳、抗弯连接器、旋转连接器等均需重新加工,投资较大,放线滑车需高挂以尽量降低放线张力,在某些大档距中间需设置防止导线落地措施,施工难度较大。一牵四施工方式各种设备受力较大,安全隐患大,需采取措施尽量将每根线张力降低至25kN,牵引机受力120kN左右,切实保证放线安全;由此所带来的高挂滑车问题使附件安装需用绞磨反滑车组提线及安装附件,以及在大档内搭设防止导线落地的跨越架,施工操作复杂,质量保证难度大。为了尽可能保证电力线路跨越工程的安全顺利进行,针对每个细节、每个数据反复分析论证,并结合相关的经验,确定可能威胁到跨越施工安全的隐患,为进一步制定可行、安全的施工方案奠定基础。当然也包括前期对工机具的选择和使用规范的确立。
3)对施工人员的安全管理。在施工中,各相关部门应该充分了解到不安全因子会对施工线路本身带来无法估计的影响。在施工管理中应该经常对施工的作业人员进行关于安全方面的教育与警醒,做好防火防盗的预防措施,并对相应的违反安全的行为采取措施,严格执行。
4)加强施工技术和对质量控制的管理。施工技术的要求和衡量要规定一定的标准,确保运用于整个施工过程,从而保证工程质量。在管理的过程中,各个岗位上人员都应该认真学习,掌握熟练的技巧并严格执行此标准。在测量施工技术的过程中,应该保证其真实性与有效性,使管理更好的进行。
5)对施工现场进行细心的管理。这是对工程的重点管理内容,应该对现场进行全方位的检查。包括对工程质量的检查,对现场作业人员的管理,协调各岗位上的作业人员,还包括对事关施工建筑材料进行彻底检查以及做好施工的每项操作流程,同时需要做到既是安全和文明性的施工,又是环保性的施工。
2、高压架空送电线路施工中质量控制的目的是为了确保工程的高效顺利进行,督促工程的质量达标,使施工的效率提高、施工的工期缩短,并全面响应对投资资金的节约和提高经济效益的原则。
二、高压架空送电线路施工中的质量控制措施
1、基础工程
高压架空送电线路的基础施工质量的好坏与高压输电线路是否能够安全的运行起着举足轻重的作用。提高输电线路基础工程的质量能更好的保证在运行过程中能最大时间的固定住杆塔,在现场作业中采用必要的技术方法并加以控制来达到施工图纸设计中所要求的质量标准。高压架空送电线路上的基础要求抗上拔力大而且比较安稳和牢固,现在常用的是混凝土和钢筋混凝土浇制基础。对于岩石基础的施工,首先要做的准备工作是采集塔位附近的岩石,与设计查勘的情况进行对比,如果存在较大的不同则应告之设计部门进行重新设计;接下来就是灌注砂浆和浇制承台了;最后就是岩石基础的开挖,这个需要建立不破坏岩石结构的整体性的基础上,并反复核对锚筋安装的尺寸位置,一切检查没有差错后,按要求进行维护。在一些便于运输和施工的地区,应当选择使用钢筋混凝土杆,预应力混凝土杆也是一种很好的选择。
2、杆塔工程
高压架空送电线路杆塔的选择是杆塔工程中不可或缺的一环。我们要考虑到高压架空送电线路的建设速度,而且还要顾及到经济性供电的可靠性以及维修的便捷性,从直线型与耐张型中选择合理地杆塔类型。另外,我们要很好的选择导线以及避雷线的支持物,其对强度以及刚度有一定的要求。
3、架线工程
高压架空输电线路架线工程施工的时候,在架线前有很多的需要准备工作,例如放线导地线连接尺度观测以及紧线与附件的安装。从展放方法的方面来讲,架线施工主要是由拖地展放和张力展放组成。其中,拖地展放不需要用使用专用设备,但对导线会造成很严重的磨损,加上劳动效率又比较低下,因此,此法要求很多的人工,并且质量难以保证。然而张力放线与此不同,它是使用牵张机械成功的让导地线始终保持一定的张力,从而保持对交叉物始终有一定安全距离。这种方法比较可靠,能保证导地线展放质量效率较高,当然有利必有弊,它有机械笨重和费用昂贵的缺陷。至于放线对滑车轮径的选取,则是一般偏大些较好,至少不小于十倍导线的直径,这样使得磨损的系数与导线在此处受到弯曲的应力都比较小。另外,只有当基础混泥土强度达到设计值的100%、杆塔结构组装已经完成并且确定螺栓已经紧固的时候,输电线路紧线工作才能开展。还有重要的一点,为了避免杆塔的受力度过大或者塔身变形迫使横担产生位移进而影响弛度观测,需要在耐张塔受到张力时方向的反侧打好临时拉线。
三、结束语
总而言之,任何项目想要得到很好的效益,同样的要保证项目的质量,他们之间是成正比的关系。施工阶段的质量控制对高压架空送电线路工程的质量在很大程度上起着决定性的作用。因此,在高压架空送电线路工程的建设中,要做好施工中的质量控制。■
参 考 文 献
[1]古顺斌,高压输电线路钻孔灌注桩基础施工与质量控制要点[J].中国建设信息,2008,5.
[2]黄挺,高压输电线路工程施工质量的综合评定方法[J].兰州工业高等专科学校学报,2005,2.
[3]杨忠辉,输电线路工程施工中技术问题及处理措施的探讨[J].广东科技电力建设专栏,2008,07
[关键词] 高压架空送电 质量控制 线路施工
High-voltage overhead transmission line construction quality control
Li Zhang
Abstract:The power grid and power system is an important component of high-voltage overhead transmission lines, the development of national economy and people's daily life plays an important role, more community a great convenience. Construction quality control as the key to the construction of a ring, its plans for the building construction, technological advancement and optimization of construction technology management played an absolute role. This paper describes the high-voltage overhead transmission line construction quality control in the main content and purpose, then the construction process of quality control measures were discussed.
Key words:high-voltage overhead power transmission; quality control; line construction
近年来,为了使高压架空送电线路更行之有效的安全运行,相关部门对高压架空送电线路的质量提出了更加严格规范的标准。对于一项具有强专业性、施工的难度大以及施工时周期比较短等特点的繁杂的系统工程,其要求十分苛刻。高压架空送电线路施工过程包括以下几个部分:首先是施工的测量工程和土石方工程,其次是基础工程和杆塔工程,最后是架线工程和接地工程。在每个工程阶段,必须用规范有效的方法进行质量控制,使在很好的完成施工全过程的同时达到预期的质量效果。
一、高压架空送电线路施工中的质量控制的主要内容和目的
1、高压架空送电线路施工中的质量控制的主要内容
1)对施工图纸的会同审查并进行技术上的交底。施工队按照设计图纸进行施工,因此在开工之前各相关部门对设计图纸进行解读,并且从图纸上了解与施工有关的有效信息是必不可少的步骤。同时也可以从设计、结构选型以及施工现场等是否满足施工需要来补充并完善设计图纸。
2)对施工组织设计和施工方案严格按照一定标准进行审核。施工组织设计是对施工活动能够实行科学管理的重要手段,它从施工的各方面来指导施工的具体活动,从使施工脚步加快了,也节约了一些施工时间,更提高了经济的效益。另外它还包含了基本建设计划以及其要求,各阶段的工作内容也详尽的写在其中。铺设电力线路,由于周围环境因素,经常需要进行跨越障碍物工作。跨越施工能否安全顺利的进行,不仅关系到整个电力线路铺设工程的进度,而且会影响到相关地区的生产生活,意义重大。本文通过分析电力线路的跨越工程安全隐患的分析,为实现最大限度的降低跨越施工的危险系数提出应对之策。
电力线路在铺设过程中,常常会遇到各种各样影响电力线路铺设工程的障碍物,这就需要通过搭设跨越架等方式进行障碍物的跨越施工。现实的电力线路作业中遇到的障碍物通常是通讯线路、公路或是地势环境恶劣的山区等,由此展开的电力线路跨越工程难度之大,危险系数之高可见一斑。大截面导线施工的设备需求量很大,有时还需采用特殊设备,牵引机及牵引绳、抗弯连接器、旋转连接器等均需重新加工,投资较大,放线滑车需高挂以尽量降低放线张力,在某些大档距中间需设置防止导线落地措施,施工难度较大。一牵四施工方式各种设备受力较大,安全隐患大,需采取措施尽量将每根线张力降低至25kN,牵引机受力120kN左右,切实保证放线安全;由此所带来的高挂滑车问题使附件安装需用绞磨反滑车组提线及安装附件,以及在大档内搭设防止导线落地的跨越架,施工操作复杂,质量保证难度大。为了尽可能保证电力线路跨越工程的安全顺利进行,针对每个细节、每个数据反复分析论证,并结合相关的经验,确定可能威胁到跨越施工安全的隐患,为进一步制定可行、安全的施工方案奠定基础。当然也包括前期对工机具的选择和使用规范的确立。
3)对施工人员的安全管理。在施工中,各相关部门应该充分了解到不安全因子会对施工线路本身带来无法估计的影响。在施工管理中应该经常对施工的作业人员进行关于安全方面的教育与警醒,做好防火防盗的预防措施,并对相应的违反安全的行为采取措施,严格执行。
4)加强施工技术和对质量控制的管理。施工技术的要求和衡量要规定一定的标准,确保运用于整个施工过程,从而保证工程质量。在管理的过程中,各个岗位上人员都应该认真学习,掌握熟练的技巧并严格执行此标准。在测量施工技术的过程中,应该保证其真实性与有效性,使管理更好的进行。
5)对施工现场进行细心的管理。这是对工程的重点管理内容,应该对现场进行全方位的检查。包括对工程质量的检查,对现场作业人员的管理,协调各岗位上的作业人员,还包括对事关施工建筑材料进行彻底检查以及做好施工的每项操作流程,同时需要做到既是安全和文明性的施工,又是环保性的施工。
2、高压架空送电线路施工中质量控制的目的是为了确保工程的高效顺利进行,督促工程的质量达标,使施工的效率提高、施工的工期缩短,并全面响应对投资资金的节约和提高经济效益的原则。
二、高压架空送电线路施工中的质量控制措施
1、基础工程
高压架空送电线路的基础施工质量的好坏与高压输电线路是否能够安全的运行起着举足轻重的作用。提高输电线路基础工程的质量能更好的保证在运行过程中能最大时间的固定住杆塔,在现场作业中采用必要的技术方法并加以控制来达到施工图纸设计中所要求的质量标准。高压架空送电线路上的基础要求抗上拔力大而且比较安稳和牢固,现在常用的是混凝土和钢筋混凝土浇制基础。对于岩石基础的施工,首先要做的准备工作是采集塔位附近的岩石,与设计查勘的情况进行对比,如果存在较大的不同则应告之设计部门进行重新设计;接下来就是灌注砂浆和浇制承台了;最后就是岩石基础的开挖,这个需要建立不破坏岩石结构的整体性的基础上,并反复核对锚筋安装的尺寸位置,一切检查没有差错后,按要求进行维护。在一些便于运输和施工的地区,应当选择使用钢筋混凝土杆,预应力混凝土杆也是一种很好的选择。
2、杆塔工程
高压架空送电线路杆塔的选择是杆塔工程中不可或缺的一环。我们要考虑到高压架空送电线路的建设速度,而且还要顾及到经济性供电的可靠性以及维修的便捷性,从直线型与耐张型中选择合理地杆塔类型。另外,我们要很好的选择导线以及避雷线的支持物,其对强度以及刚度有一定的要求。
3、架线工程
高压架空输电线路架线工程施工的时候,在架线前有很多的需要准备工作,例如放线导地线连接尺度观测以及紧线与附件的安装。从展放方法的方面来讲,架线施工主要是由拖地展放和张力展放组成。其中,拖地展放不需要用使用专用设备,但对导线会造成很严重的磨损,加上劳动效率又比较低下,因此,此法要求很多的人工,并且质量难以保证。然而张力放线与此不同,它是使用牵张机械成功的让导地线始终保持一定的张力,从而保持对交叉物始终有一定安全距离。这种方法比较可靠,能保证导地线展放质量效率较高,当然有利必有弊,它有机械笨重和费用昂贵的缺陷。至于放线对滑车轮径的选取,则是一般偏大些较好,至少不小于十倍导线的直径,这样使得磨损的系数与导线在此处受到弯曲的应力都比较小。另外,只有当基础混泥土强度达到设计值的100%、杆塔结构组装已经完成并且确定螺栓已经紧固的时候,输电线路紧线工作才能开展。还有重要的一点,为了避免杆塔的受力度过大或者塔身变形迫使横担产生位移进而影响弛度观测,需要在耐张塔受到张力时方向的反侧打好临时拉线。
三、结束语
总而言之,任何项目想要得到很好的效益,同样的要保证项目的质量,他们之间是成正比的关系。施工阶段的质量控制对高压架空送电线路工程的质量在很大程度上起着决定性的作用。因此,在高压架空送电线路工程的建设中,要做好施工中的质量控制。■
参 考 文 献
[1]古顺斌,高压输电线路钻孔灌注桩基础施工与质量控制要点[J].中国建设信息,2008,5.
[2]黄挺,高压输电线路工程施工质量的综合评定方法[J].兰州工业高等专科学校学报,2005,2.
[3]杨忠辉,输电线路工程施工中技术问题及处理措施的探讨[J].广东科技电力建设专栏,2008,07