以临沂市高温蒸汽管道直埋工程为例 ,介绍了应用高温蒸气管道直埋技术时 ,应准确绘出带状图 ,施工及验收标准要切合实际 ,严格要求钢管质量
Taking the direct burial project of high-temperature steam pipes in Linyi City as an example, the application of high-temperature steam pipe direct burial technology is described. The strip chart should be accurately drawn. The construction and acceptance standards should be realistic and strictly require the quality of steel pipes.