论文部分内容阅读
广东省已投运和在建脱硫工程共有16个。通过对它们的成本进行统计、计算和分析,总结出机组容量、脱硫工程的建设时期、燃料特性、脱硫装置年利用小时数、脱硫工艺等是影响机组单位供电量脱硫成本的主要因素。而燃料特性则是影响脱单位质量SO2成本的决定性因素。
Guangdong Province has put into operation and under construction a total of 16 desulfurization projects. Through the statistics, calculation and analysis on their costs, the main factors that affect unit power consumption desulfurization cost are summarized, such as unit capacity, construction period of desulfurization project, fuel characteristics, annual utilization hours of desulfurization equipment and desulfurization process. The fuel characteristics are the decisive factors that affect the SO2 cost per unit mass.