第十八条施工阶段质量管理一、必须通过招标择优选择施工队伍,施工单位必须有健全的质量保证体系,措施落实,实行全面质量管理。二、必须有经过审查批准的施工组织设计或施工措施方案。并制定有保证质量的目标及相应的措施,编制有符合规范(规程)要求的施工方法、检测方法,备有能保证工程质量的施工机械,计量仪器、仪表准确齐全。三、凡超出设计要求和规范内容的施工、吊装
Article 18 Quality Management in the Construction Phase I. The construction team must be selected through tendering. The construction unit must have a sound quality assurance system, implement the measures, and implement total quality management. Second, there must be a review of the approved construction organization or construction measures program. And to establish a guaranteed quality of the goal and the corresponding measures, the preparation of a construction method that meets the specification (procedure) requirements, testing methods, with construction machinery to ensure the quality of the project, measuring instruments, instruments and accurate complete. Third, all construction and lifting beyond the design requirements and specification content