论文部分内容阅读
在考虑动态部分重构及重构延时等特征的基础上,采用遗传算法及其与爬山算法的融合实现可重构系统软硬件任务的划分,并采用动态优先级调度算法进行划分结果的评价。实验表明,在可重构系统的资源约束等条件下,算法能够有效地实现应用任务图到可重构系统的时空映射。
Considering the characteristics of dynamic partial reconstruction and reconstruction delay, genetic algorithm and its integration with hill-climbing algorithm are used to realize the task assignment of reconfigurable system hardware and software, and the dynamic priority scheduling algorithm is used to evaluate the result of segmentation. . Experiments show that the algorithm can effectively implement the space-time mapping from task map to reconfigurable system under the condition of resource constraints of reconfigurable system.