介绍本工程的结构转换梁在施工中采用二次浇筑法 ,利用叠合梁原理解决梁的施工荷载传递问题 ,采用钢管支撑系统和解决钢筋密集情况下的混凝土浇筑问题。
Introduction of the structure of the project Conversion beam in the construction of the second pouring method, the use of composite beams to solve the problem of beam load transfer construction, the use of steel pipe support system and to solve the problem of concrete pouring intensive conditions.