2012年12月26日下午13:05,北苑变下仓614线路速断跳闸,经抢修,于19:30分恢复送电。此次停电造成该线路A用户很多正在正常生产的机器设备损坏,直接经济损失10万余元,并被迫停工检修,所造成的间接经济损失5万余元。为此,A用户于2012年12月31日给供电公司发函,并附了损失清单,要求做出妥善处理。经调查发现,此次线路跳闸是由于某施工单位B野蛮施工吊机碰线引起的,有抢修记录和B公司的付款凭证为证。另外,供电公司线路维护人员在日常巡线时已
At 13:05 on December 26, 2012, Beiyuan changed warehouse 614 line quickly tripped, repaired, restored at 19:30 minutes. The power outage caused a lot of users of the line A is damaged in the normal production of machinery and equipment, direct economic losses of 10 million yuan, and was forced to suspend work overhaul, resulting in indirect economic losses of 50,000 yuan. To this end, A users on December 31, 2012 sent a letter to the power company, and attached a list of losses, requiring proper handling. After investigation, it was found that the tripping of the circuit was caused by the collision of a barge construction crane of a construction unit B with the records of repairs and the proof of payment of Company B. In addition, the power company line maintenance staff in the daily patrol line already