荣称“天下第一坝”的三峡工程,混凝土纵向围堰位于中堡岛右侧,是三峡主体工程的组成部分。全长1228.45m,其中坝身段长106m,大坝上游段长544.21m,大坝下游段长578.24m。最大高度90m。混凝土168.14万m~3,其中84.2%为碾压混凝土(RCC)。在一期土石围堰保护下进行施工。在三峡工程施工期间其作用是将原中堡岛左右河床(后河与大江)分成一期、二期导流。大江截流后则是二期围堰的组成部分,保护二期工程施工(大江基坑开挖和大江溢流坝及左岸发电厂房)以及右岸明渠通航。
The Three Gorges Project, which is called “the best dam in the world” and the concrete longitudinal cofferdam is located on the right side of Zhongbao Island and is an integral part of the Three Gorges Project. The total length of 1228.45m, of which dam body length of 106m, dam upstream section 544.21m, dam downstream section length 578.24m. The maximum height of 90m. 1,681,400 m 3 of concrete, 84.2% of which are RCCs. In a stone earth cofferdam construction under protection. During the construction of the Three Gorges Project, its role is to divide the riverbed (Houhe River and Dajiang River) of the original Zhongbao Island into a first phase and a second phase of diversion. After the closure of the main river, the two cofferdams form part of the project to protect the construction of the second phase of the project (excavation of the large river foundation pit and the construction of the large river spillway dam and the left bank powerhouse) and the navigation of the right bank open channel.