论文部分内容阅读
介绍了控制小断层发育程度的相关因素及其分布规律,以及运用单元统计法对该矿小断层破坏程度进行了分区预测,并在未采区初步圈出了适于综采的范围。
The related factors controlling the development degree of small faults and their distribution are introduced. And the statistical method of unit statistics is used to predict the extent of the small faults in this mine, and the range suitable for fully mechanized mining is preliminarily found out in the undeveloped areas.