基本概况 1985年5月我室采用控爆技术拆除了一座旧水塔,该塔座落在徐州市某厂院内,水塔高24米,内径4.1米,墙厚0.37米,砖砌结构,下部正南偏西4°有一门。水塔北1.6米处有一简易平房,西南37米处是新建花房,南60米处是一大车间,东南35米处有一制冷间(图1)。拟定方案根据水塔周围设施情况和厂方要求,确定水塔向南偏西4°倒塌。采用水平切口,
Basic situation In May 1985, our office used the explosion control technology to dismantle an old water tower. The tower is located in a factory in Xuzhou City. The water tower is 24 meters high and 4.1 meters in inside diameter. The wall is 0.37 meters thick. The brickwork structure is in the lower part of the south. There is a door at 4° west. There is a simple bungalow 1.6 meters away from the north of the water tower, a new flower house 37 meters southwest, a big workshop 60 meters south and a freezer 35 meters southeast (Figure 1). According to the situation of the facilities around the water tower and the factory’s requirements, the proposed scheme will determine that the water tower has collapsed 4° west to the west. With horizontal incisions,