论文部分内容阅读
日照港10万t级煤码头工程,是我国第六个五年计划期间国家重点建设项目之一,也是我国第一批利用日本海外经济协力基金会贷款的项目,1982年开始了主体工程的正式开工,1985年进行了重载试车。煤炭装卸设备作为配套供电设备,采用了大量进口设备,现结合投运以来的运行情况介绍其特点。 1)变压器。各装卸机械上及其配套的4个变电所安装的动力变压器,大多是日本富士公司生产的充氮低损耗型变
Rizhao Port 100,000 t-level coal terminal project is China’s sixth five-year plan during the state’s key construction projects is one of China’s first batch of the use of Japan Overseas Economic Cooperation Fund loans project, the official began in 1982 the main project Started in 1985, reloading test. Coal handling equipment as a supporting power supply equipment, using a large number of imported equipment, are now put into operation with the operation of the characteristics introduced. 1) Transformer. The loading and unloading machinery and its supporting 4 substations installed power transformers, mostly produced by Japan’s Fuji Nitrogen low-loss-type variable