论文部分内容阅读
2013年11月21日,《上海市轨道交通管理条例》由上海市第十四届人民代表大会第九次会议修订并通过,并于2014年1月1日起施行,《条例》中明确规定了关于地铁建设、运营服务、安全管理等方面的标准,这意味着上海轨道交通的安全建设有了新的规范依据。2000年以前,上海地铁属于直线制,那时候的地铁线路比较单一,一条线就是一条线,相互之间交集比较少,彼时的地铁运营和建设板块是分开的。到了21世纪初,为了迎接世博会的召开,上海地铁有了突飞猛进的发展,新开通了5条地铁路线,同时老线路1、2号线地铁也开通了新的延伸段,使
On November 21, 2013, the “Regulations on the Administration of Rail Transit in Shanghai” were revised and passed by the Ninth Session of the 14th Shanghai Municipal People’s Congress and implemented on January 1, 2014. The “Regulations” explicitly stipulate The standards on subway construction, operation and service, safety management and so on mean that there is a new normative basis for the safety construction of Shanghai’s rail transit. Before 2000, the Shanghai Metro belonged to a straight line system. At that time, the metro lines were relatively simple. One line was a line with less intersection and the subway operation and construction sectors were separated from each other at that time. By the beginning of the 21st century, in order to meet the World Expo, the Shanghai Subway has made rapid development. Five new subway lines have been opened up. At the same time, new extensions of Metro Line 1 and Line 2 have been opened to enable