我公司在深圳特区担任海丰苑 B 塔(衡山阁)的施工任务。该大楼为井字形框筒结构。地下一层,裙房三层,共三十四层,顶标高96米。我们采用进口意大利 MCA4213内爬塔吊作为主要垂直运输设备,另辅助一台室外电梯,圆满解决了主体和装修的垂直运输任务,仅用六天时间,安全地将塔吊从一百多米高处拆下,保证了海丰苑按合同工期竣工。本文介绍内爬塔吊的拆除情况。一、拆除方案的确定
Our company is the construction task of Haifeng Court B Tower (Hengshan Pavilion) in Shenzhen Special Economic Zone. The building is a box-shaped structure. The ground floor, three-story podium, a total of 34 layers, 96 meters above the top elevation. We use the imported Italian MCA4213 inner climbing tower crane as the main vertical transport equipment, and we also assisted an outdoor elevator to successfully solve the vertical transport tasks of the main body and the decoration. In only six days, the tower crane was safely dismantled from a height of over one hundred meters. Next, it was ensured that Haifeng Court was completed according to the contract period. This article describes the removal of the inner tower crane. I. Determination of demolition plan