临清卫运河大桥横跨山东、河北两省,是晋煤东运的咽喉。该桥上游1.4km处,有一老桥——临清先锋大桥,系1959年竣工的主跨50m系杆拱桥,桥面宽7m,设计标准为汽—13拖—60。据1989年底统计,现交通量已达万余次/昼夜,且重车占很大比重,两岸人民迫切要求修建新桥,以缓解交通拥挤现象。山东省交通厅决定利用贷款修建新桥,并已列为全省重点建设项目之一。
Linqing Wei Canal Bridge across Shandong and Hebei provinces, Shanxi coal is the throat of coal shipped. 1.4km upstream of the bridge, there is an old bridge-Pioneer Bridge of Linqing, which was completed in 1959, with a main span of 50m tied arch bridge with a bridge width of 7m and a design standard of steam -13 drag -60. According to statistics from the end of 1989, the traffic volume has now reached more than 10,000 times / day and night, and heavy vehicles account for a large proportion. The people on both sides of the strait are desperately requesting the construction of a new bridge to ease traffic congestion. Shandong Provincial Communications Department decided to use loans to build a new bridge and has been listed as one of the province’s key construction projects.