论文部分内容阅读
上海游泳馆建于上海体育馆东南,内设跳水池、游泳池、训练池各一只,钢筋混凝土柱子最长26米,重45吨,屋面采用钢管球节点三向网架结构,三向网架的每一根正三角形边的投影长度为5.196米,网架为不等边六角形,南北轴线距90米,连挑檐为101米,东西轴线距93.528米,连挑檐为105.9米,建筑面积7690平方米,观众席约3500个座位,网架上弦南北向略有坡度,下弦东西向上斜起,故此网架中心最大高度为7.6米,最低为4米,屋脊标高为+25.15米,自然地坪约为-4米,网架采用在地坪拼装,用4根50米高独脚采用8对H140×8D滑轮组,并由8台10吨电动卷扬机牵引整体提升,提升高度约21.75米,当网架超过柱顶30厘米后,由4对H50×6D移位滑轮组及4台5吨电动卷扬机牵引空中向南移位2.4米就位。
Shanghai Natatorium is built in the southeast of Shanghai Stadium. It includes a diving pool, swimming pool and training pool. The length of reinforced concrete pillars is 26 meters and weight is 45 tons. The roof adopts a three-way network structure of steel pipe joints and three-way network racks. The projection length of each equilateral triangle is 5.196 meters. The grid is an equilateral hexagon, the north-south axis is 90 meters away, the provocation is 101 meters, the east-west axis is 93.528 meters, and the provocation is 105.9 meters. 7690 square meters, the audience seat is about 3500 seats, the network shelf is slightly inclined north and south, the next string is up and down, so the maximum height of the network center is 7.6 meters, the minimum is 4 meters, the elevation of the roof is +25.15 meters, naturally Ping is about -4 meters, the grid used in the floor assembly, with four 50 meters high single foot using 8 pairs of H140 * 8D pulley group, and by eight 10 tons of electric winch traction overall promotion, lifting height of about 21.75 meters, when After the grid was over 30 centimeters above the column top, four pairs of H50 x 6D shift pulley blocks and four 5 tons electric winches pulled the air and shifted 2.4 meters into place.