论文部分内容阅读
文中提出了一种应用现代计算技术实现方案最优化的露天矿采剥工作五年计划的远景评价方法,克服了手工编制长期计划的传统方法的不足,并以日列肯采选公司中央露天矿为例,通过多方案自动化数学模拟对比,阐述了远景评价方法的优越性。
In this paper, a long-term evaluation method of five-year plan of open-pit mining with open-pit mining using modern computing technology is proposed, which overcomes the shortcomings of the traditional method of manual long-term planning. In addition, As an example, the superiority of the long-term evaluation method is illustrated through the comparison of multi-programmatic mathematical simulation.