上海宾馆现浇钢筋混凝土工程量大,用模板多,标准层大间平台面积占整个标准层平台面积的80%。为减少塔机吊次,提高作业效率,我们在学习兄弟单位经验的基础上,试验成功一套组合台模整体安装,整体拆除,整体移动的新工艺。一、台模设计在确定台模构造时,我们考虑了以下几个因素: 1.台模的平面尺寸要适应具体工程对象的开间尺寸,减少镶补周边的工作量。 2.台模的面板、配件和管材要尽量采用标准扣件和标准规格,达到通用性强的目的,以便在不用台模时,模板配件仍能使用。
The number of cast-in-place reinforced concrete projects in Shanghai hotels is large. There are many templates, and the standard floor and large-scale platform platforms account for 80% of the entire standard-level platform area. In order to reduce crane hoisting times and improve operational efficiency, we have successfully tested a whole set of modular table molds as a whole, dismantled them, and moved the entire new process on the basis of the experience of the fraternal units. First, the design of the table mold In determining the Taiwan mold structure, we consider the following factors: 1. The plane size of the table model to adapt to the specific project object opening size, reduce the amount of work around the mosaic. 2. The use of standard fasteners and standard specifications should be used as far as possible for the panel, fittings and pipes of the table top to achieve the purpose of strong versatility so that the template parts can still be used without the use of the table mould.