XH27-H1井河油田的一口水平井,由长城钻探钻井一公司负责整体施工,工程院负责水平井段轨迹控制及LWD仪器服务。该井因油层薄,要求水平段纵向轨迹控制误差0.5 m,考虑到钻头尺寸φ215 mm,因此轨迹控制难度极大,通过工程地质相结合,及时准确的待钻轨迹预测,制定严谨的工程施工工序,该井水平段顺利按要求完成施工,实际轨迹控制精度纵向±0.48 m。本文通过对该井施工情况的简介,介绍了该井施工过程所采用的技术措施。
The horizontal well of XH27-H1 Jinghe Oilfield is under the overall construction of Great Wall Drilling and Drilling Company, and the engineering institute is responsible for horizontal well trajectory control and LWD instrument service. Due to the thin oil layer, this well requires longitudinal control error of 0.5 m in the horizontal section. Considering the bit size of φ215 mm, the trajectory control is extremely difficult. Through the combination of engineering geology and timely and accurate prediction of the trajectory to be drilled, a rigorous construction procedure The horizontal section of the well completes the construction smoothly according to the requirements. The actual trajectory control accuracy is ± 0.48 m vertically. Through brief introduction of the well construction situation, this paper introduces the technical measures adopted in the well construction process.