引言Elektromark为西德西南地区一个具有约130万千瓦装机功率的地区性供电企业。隶属于该企业的埃尔弗林发电厂的第一台发电设备是于1911年建造的。采用液态除渣炉膛的新型30万千瓦机组于1982年年中投入运行。本文简要介绍了这一设备,并报道了锅炉装置的初步运行经验。水一蒸汽循环设备是以3500小时/年全负荷利用率来规划的。根据这一要求和邻近的22万千瓦机组的运行经验,选用了如下所示的主要设计数据。
Introduction Elektromark is a regional power supply company with installed capacity of about 1.3 million kilowatts in southwestern West Germany. The first power plant belonging to the company’s Ephrinine power plant was built in 1911. The new 300,000-kilowatt unit with liquid slag-removing furnace was put into operation in mid-1982. This article gives an overview of the equipment and reports on the initial operation of the boiler plant. The water-steam cycle is planned at full load utilization of 3,500 hours / year. Based on this requirement and the operating experience of the neighboring 220 MW unit, the main design data as shown below was selected.