论文部分内容阅读
一、前言近年来随着城市建设的进展,高层度筑,尤其高层住宅建筑也有了很大幅度的发展。与此同时,大力推行集中供热,即热电厂供热和区域锅炉房供热,也已提到议事日程。高层建筑在采暖方面带来的问题,除了热负荷计算别具特点,以及为了控制竖向失调和从系统结构设计角度出发而往往将系统予以分区之外,合理解决与热网的连接,也成了突出问题。为了正确处理高层建筑采暖系统与集中供热系统水压工况之间的矛盾,高层
I. INTRODUCTION In recent years, with the progress of urban construction, high-rise buildings, especially high-rise residential buildings, have also experienced significant development. At the same time, the implementation of centralized heating, ie heating of thermal power plants and heating of regional boiler rooms, has also been mentioned on the agenda. The problems brought about by heating in high-rise buildings, in addition to the unique characteristics of thermal load calculation, and in order to control the vertical misalignment and often partition the system from the point of view of system structural design, properly resolve the connection to the heating network. Outstanding problems. In order to correctly handle the contradiction between high-rise building heating systems and the hydraulic conditions of centralized heating systems,