论文部分内容阅读
建材七○一矿第二矿区是我国第一个金刚石原生矿岩管露天开采矿区。金刚石矿石量用地磅计量,而露天旷废石剥离则通过测量计量。因为露天矿剥离完成计划与否是衡量矿山是否执行剥采计划化与管理科学化的重要指标。而这一切的基础有赖于计量的准确性,要求剥离验收测量保证一定的精度。这里对剥离验收测量的精度进行初步的分析。
The No. 701 Second Mine of Building Materials is the first open diamond mining area for diamond raw rock in China. The amount of diamond ore is measured in ground pounds, while the exfoliation of open waste stone is measured by measurement. Because whether or not an open-pit mine stripping plan is completed is an important indicator to measure whether or not the mine implements planned stripping and scientific management. The basis of all this depends on the accuracy of the measurement, requiring that the stripping acceptance measurement ensure a certain degree of accuracy. Here a preliminary analysis of the accuracy of stripping acceptance measurements is performed.