潼关变电站电力负荷监控技术研究

来源 :西北电力技术 | 被引量 : 0次 | 上传用户:sunjing123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 潼关变电站情况简介 潼关变电站负责供给潼关地区金矿、钼矿等矿区的开采、加工、冶炼所需之电力负荷。该变电站原只安装一台20MVA变压器,后因电力负荷增加,又扩容了一台16MVA变压器,目前变电容量共36MVA。近几年,金矿、钼矿的加工工业急速发展,用电量急剧增加。据对潼关变实地考察,电力负荷经常处在34MVA上下波动,并时常出现45~47MVA,甚至更大的负荷需求。此时,依 1 Tongguan substation Fact sheet Tongguan substation is responsible for the supply of Tongguan gold and molybdenum mining and other mining, processing, smelting the required electrical load. The substation was only installed a 20MVA transformer, due to increased power load, but also expanded a 16MVA transformer, the current total capacity of 36MVA. In recent years, the processing industries of gold mines and molybdenum mines have witnessed a rapid development with a sharp increase in electricity consumption. According to the site visits Tongguan change, the power load is often fluctuated in the 34MVA, and often appear 45 ~ 47MVA, or even greater load demand. At this point, according to
其他文献
对气质吸式割前摘脱装置的流场特性,以及影响落粒损失的因素进行了理论分析与试验研究。研究结果表明,该摘脱装置由于采用气流吸运落粒损失低。且简化了机构,为在行走装置前设置
新课改下的“教学相长”理念,以学习能力素养为“第一要义”,倡导教师的“教”和学生的“学”相互促进、相互补充.本文作者从学生这一角度,简要阐述了对新课改下的“教学相长
生成与预设是一对矛盾的统一体.有效地预设,是为了更好地生成;精彩的生成来自精心的预设.但实际教学中,教学不能完全预设,课堂生成性问题作为一种“意料之外”的教学资源往往
每个学生都有自身的特点,只要教师能正确的引导与教育,相信每个学生都能得到最好的发展,取得成功.本文主要从明确成功教育的意义,成功教育的教学策略等方面来阐述在初中物理
该文根据南京大学大气科学系气候专业所作的几次南京城市气候考察,对南京市城郊气温的垂直分布特征作了分析,发现,1983年7月和1984年8月由于选点的不同,加之天气条件的差异,夏季夜
数学应用意识,是复杂而又丰富的数学素养.高中生在自主探知数学新知识内涵、自主解析数学新问题进程,必须借助已有数学知识素养、解析案例技能等方面经验素养,进行思维分析的
在高中课程中,数学这门课,对于文科或者理科都是很重要的一门课,在高考分数中占着很大比重,它知识点繁多,覆盖面广,难度大,很多高中生的数学成绩差,在高考中拖了后腿,整体分
《数学课程标准》在基本理念中明确指出:“评价的主要目的是为了全面了解学生的数学学习历程,激励学生的学习和改进教师的教学;应建立评价目标多元、评价方法多样的评价体系