兴山县苍坪河水电站是香溪河流域梯级开发的第一级水电站,是以发、供电为主体经营的地方国营企业,总装机容量3×2500kW,设计水头135m,设计年发电量为4330万kW·h,年利用小时5590h。电站工程总投资840万元,现有固定资产960万元。该电站于1983年3月动工兴建,1984年10月1日第一台机组投产,1985年5月3台机组
The Cinginghe Hydropower Station in Xingshan County is the first-stage hydropower station in the Xiangxi River Basin. It is a local state-owned enterprise operating on electricity and electricity. It has a total installed capacity of 3×2500kW, a designed water head of 135m, and a designed annual power generation capacity of 4330. Million kW·h, annual utilization time 5590h. The total investment of the power station project is 8.4 million yuan, and the existing fixed assets are 9.6 million yuan. The power station was started construction in March 1983. The first unit was put into operation on October 1, 1984, and three units in May 1985.