奥山世纪城K-2-1地块基坑工程平面形状复杂、不规则,距离长江较近,同时开挖面积大,达到了47600平方米,开挖深度较深,实际挖深达到1015-12.25米,给支护设计带来一定的难度,因此基坑挡土结构物采用双排桩支护的方案,对地下水采用深井降水井和侧壁竖向隔渗止水的方案,在施工中采用信息化施工管理,保证地下室主体结构的顺利施工,为双排桩的设计和施工积累了丰富的经验。
Ordos Century K-2-1 block foundation pit project complex and irregular shape, from the Yangtze River is relatively close, while excavation area, reaching 47600 square meters, deep excavation depth, the actual depth of cut reached 1015-12.25 Therefore, the project of retaining structure of foundation pit adopts the scheme of double-row piles support, and the scheme of adopting deep well dewatering wells and vertical impermeable sealing water on the side walls of groundwater is adopted in the construction Information construction management, to ensure the smooth construction of the main basement structure for double-row pile design and construction has accumulated rich experience.