本文介绍的是用钢渣桩加固软土地基的一个成功的工程实例。钢渣桩加固软土地基仅乏近年刚开始使用的新方法,是介于碎石桩和钢筋混凝土短桩之间的一种新型的地基加固方法,它既比钢筋混凝土短桩省去大量的钢筋、水泥,又没有碎石桩的泥浆排污问题和石料的来源问题。它利用了废钢渣作原料,不仅利用了三废,而且也减少三废对地区环境的污染。本文提供的上海某工程应用钢渣桩加固地基的情况,仅供各部门采用这一新型加固地基方法时参考。
This article describes a successful project example of using steel slag piles to reinforce soft ground. Steel slag pile reinforcement of soft soil foundations is only a new method that has just been used in recent years. It is a new type of foundation reinforcement method between gravel piles and reinforced concrete short piles. It saves a large amount of steel reinforcement than reinforced concrete short piles. , cement, and there are no problems with the mud discharge of gravel piles and the source of the stone. It uses scrap steel slag as raw material, not only using the three wastes, but also reducing the pollution of the three wastes to the local environment. In this paper, the application of steel slag pile reinforcement foundations in a project in Shanghai is for reference only when the various departments adopt this new method of strengthening the foundation.