本文介绍了长诏水库混凝土砌石坝的稳定性模型试验的情况.施工过程中发现长诏坝基下半风化岩体中埋藏有多条夹泥层,其摩擦系数较低.设计选用在坝趾后建齿墙,利用齿后岩石共同保证挡水坝的稳定.总共进行了两种齿墙十一种情况的试验研究.本文还叙述了长诏坝稳定试验中的一些试验技术问题,包括P(作用于上游坝面的水压力)—δ(水平位移)曲线的形态,夹层材料的模拟和层面中初应力的影响等问题. In this paper, the stability model test of Changzhao Reservoir Concrete Masonry Dam is introduced. During the construction process, it is found that there are many mud layers buried in the lower semi-weathered rock mass of Changzhang Dam with lower friction coefficient. After the construction of the tooth wall, the use of rock after the rock together to ensure the stability of retaining dam.There are a total of two kinds of gear wall eleven kinds of experimental research.This paper also describes the Changzhang dam stability test of some experimental techniques, including P ( The water pressure acting on the upstream dam surface) -δ (horizontal displacement) curve, the simulation of interlayer material and the influence of initial stress in the surface.
其他文献
八盘峡工程为低水头河床式水电站(设计水头18米),主要建筑物有:右岸电站厂房(装机五台,总容量18万千瓦),河床中部间隔布置三孔闸和二孔溢流坝,左岸为二孔溢流坝及设在副坝内
为贯彻全国第四次水土保持工作会议精神,省水电厅、林业厅于一九八二年十二月下旬联合召开了全省水土保持工作会议。省人民政府于今年三月批转了省水电厅、林业厅《关于全省
为了更好地贯彻十一届六中全会的精神,搞好水利系统工作着重点的转移,使《水利科技》在我省经济调整时期发挥更大的作用,经省水利厅同意,决定成立江西《水利科技》编委会,并
暑期,我们参加了校长(园长)研修营外出考察学习活动,此次考察活动围绕“校长领导力修炼”这一主题,我们走进南通、上海的几所中小学和幼儿园,听取名校长(园长)经验介绍、互动
两年一度的国际河口研究联合会(International Estuarine Research Federation)1981年11月1日至11月6日在美国俄勒冈(Oregon)州召开。参加会议的有美、中、英、日、荷、加等
旅游景区的翻译是我国旅游业对外宣传的主要渠道,其翻译质量直接影响到我国旅游业的发展和旅游国际化进程。由于旅游翻译是一种跨文化交际,本文探讨了跨文化交际意识对旅游景
汉语汉语隶属于汉藏语系,与英语及多数欧洲语言所属的印欧语系截然不同。由于汉语不具有法语、德语以及西班牙语所具备的与英语一样的同源词,所以对美国人来说,学习汉语要比
2003年9月13日尊敬的各位领导、各位专家学者:首先请允许我代表北京外国语大学向“西洋汉语研究国际研讨会”的召开表示热烈的祝贺!向李宇明司长、张国庆主任、沈家煊研究员
危害水利工程的白蚁——堤坝白蚁,如果在堤坝内隐藏日久,对其治理又不及时则会“千里金堤,溃于蚁穴”,人民生命财产将受到巨大的损失。危害堤坝的白蚁,主要是黑翅土白蚁。这