论文部分内容阅读
本文分析了该锅炉超温的原因,详述了改进前后的试验结果.并指出了日方所提出的改进方案的不足之处.文章最后认为,本所所提出的过热器和再热器同屏热偏差计算方法用于结构和系统不同的进口锅炉也能获得满意的结果.
This paper analyzes the reasons for overheating of the boiler, details the test results before and after the improvement, and points out the shortcomings of the improvement plan proposed by the Japanese side.The article concludes that the proposed superheater and reheater Screen thermal deviation calculation method for the structure and system of different imported boiler can get satisfactory results.