地下连续墙在上海软土地层中应用发展至今已有28年历史,据85个项目统计表明总计已完成57.733万平方米地下连续墙。由于该施工工艺具有一系列优点,因而具有强大的生命力。从许多原体实测结果表明,地下连续墙应用安全有保证,又比较材尽其用。有人曾与国外设计的新加坡地铁车站对比,上海地下连续墙设计和施工具有一定的先进性。
The application of the underground continuous wall in the Shanghai soft soil layer has been a 28-year history. According to statistics of 85 projects, a total of 577,300 square meters of underground continuous walls have been completed. As this construction process has a series of advantages, it has a strong vitality. From the results of many actual measurements of the original body, it is shown that the safety of the underground continuous wall application is guaranteed and that it is compared to the best use of the material. Some people have compared with Singapore subway stations designed abroad. The design and construction of the underground continuous wall in Shanghai has a certain degree of advancement.