论文部分内容阅读
韶钢4号高炉在炉役后期通过加强炉体维护,采取一系列符合自身实际情况的技术措施,灵活利用上下部调剂手段,制定合理的操作制度和管理措施,获得较好的技术经济指标。
Shaogang No.4 blast furnace through strengthening furnace maintenance in the late stage of the furnace, adopting a series of technical measures in line with its own actual conditions, flexible use of the upper and lower parts of the adjustment means to develop a reasonable operating system and management measures to obtain better technical and economic indicators.