论文部分内容阅读
一、建设的高质量保证了矿井提前达产 显德汪煤矿位于河北邢台地区南部的沙河县境内,设计年产量90万吨,1982年11月10日投产,预计1985年底,三年就可达到设计产量。三年达产是与生产矿的积极努力分不开的,但主要原因是矿井的设计布局合理,施工要求严格,设计部门和施工单位做到了密切配合,互相协作,使矿、土、安三类工程质量达到了设计要求,满足了生产需要。
First, the construction of high quality to ensure that the mine ahead of schedule Xiande Wang coal mine is located in the southern Xingtai region of Hebei Shahe County, the design annual output of 900,000 tons, November 10, 1982 put into production is expected by the end of 1985, three years can be achieved Design production. The three-year production is inseparable from the active efforts of producing mines, but the main reason is that the design and layout of the mines are reasonable and the construction requirements are strict. The design department and the construction units have closely cooperated and cooperated with each other so that the mines, Quality of the project has met the design requirements to meet the production needs.