1 工程概况原工程主楼地上27层,地下3层,裙房5层,总建筑面积5万 m~2,结构形式为钢筋混凝土框剪体系。主楼为筏板基础,基础埋深-13.7m(底板面标高为-11.2m),采用预应力管桩,桩基持力层为⑦_2层粉细砂。裙房为柱下独立承台桩基础,基础埋深-12.7m,采用方桩,桩基持力层为⑦_1层砂质粉土。本次续建结构工程主要为:增设地下夹层,6层楼面(裙房屋面)增设冷却塔,配合水电暖通要求,在楼板和剪力墙局部增设管道洞。续建建筑抗震设防按丙类,设防烈度为7度、近震,建筑场地为Ⅳ
1 Project Overview The main project of the original main building 27 floors, 3 underground, 5 podium, with a total construction area of 50000 m ~ 2, the structure of the form of reinforced concrete frame shear system. The main building is a raft foundation, the basic depth of -13.7m (floor surface elevation of -11.2m), the use of prestressed pipe piles, pile bearing layer is ⑦_2 layer of fine sand. Podium for the column under the independent cap pile foundation, the basic depth of -12.7m, the use of square piles, pile bearing layer ⑦_1 layer of sandy silt. The continuation of the main structural works: additional mezzanine, additional 6-storey building (skirt roof) cooling towers, with the requirements of water and electricity HVAC, in the floor and shear wall local additional pipe holes. Continued building seismic fortification according to Class C, fortification intensity of 7 degrees, near earthquakes, construction sites for the IV