论文部分内容阅读
三作用复合式深基础结构的施工存在一定的难度,经采用半逆作业施工法,以及对埋件定位、柱子浇捣等问题采取了相应的措施,取得了较好的效果.
The construction of the three-function compound deep foundation structure has certain difficulties. After adopting the semi-reverse construction method, and adopting measures such as the positioning of embedded parts and the pouring of columns, some good results have been obtained.