论文部分内容阅读
未来的中国国家大剧院(此图为设计效果图),位于北京人民大会堂的西侧,长安街旁。建设工程已于2000年4月动工,工期4年。
The future of China National Grand Theater (this picture is the design renderings), located in Beijing's Great Hall west of Chang'an Avenue. Construction started in April 2000, duration 4 years.