岩滩水电站是红水河梯级开发骨干电站之一,坝址位于广西巴马、都安两县交界处,装机110万kW,年发电量53.7亿kW·h,工程于1984年开工,拟于1988年截流,1993年第一台机组发电,总工期为12年。该电站左岸导流明渠开挖工程是关键施工项目。明渠全长
Yantan Hydropower Station is one of the key hydropower stations in Hongshui River cascade development. The dam site is located at the junction of the two counties of Bama and Du’an in Guangxi. It has an installed capacity of 1.1 million kW and an annual generating capacity of 5.37 billion kW · h. The project started in 1984 and is planned to be developed at Closure in 1988, the first generating unit in 1993, the total duration of 12 years. The power station left bank diversion canal excavation project is the key construction project. Open channel full length