论文部分内容阅读
随着我国社会主义建设事业的迅速发展,原来分散布置的单个车间,已不能适应生产发展的需要。代之而起的是集中布置,大柱网的、灵活性较强的车间,这种车间给建筑结构提出了新的要求。我们为了适应社会主义建设的需要、减少基本建设费用、节约用地、加快建设速度、便于工艺变更、提高劳动生产率,我院在原一机系统内组织了一次12×12、12×18、18×18大柱网屋盖结构设计方案的竞赛活动。从去年11月底发出通知,到今年3月中旬有9个设计院(处),约50人参加,共做出了25个设计方案。这些方案自今年6月20日到7月14日,在总院
With the rapid development of the socialist construction in our country, the original scattered workshops cannot meet the needs of production development. Instead, it is a workshop with a centralized arrangement, a large column of nets, and a high degree of flexibility. This kind of workshop puts forward new requirements for the building structure. In order to meet the needs of socialist construction, reduce the cost of capital construction, save land, speed up construction, facilitate process changes, and increase labor productivity, our institute organized a 12×12, 12×18, 18×18 in the original machine system. Large column net roof structure design competition. From the notice issued at the end of November last year, there were 9 design institutes (offices) in the middle of March this year, and about 50 people participated in the program. A total of 25 design proposals were made. These plans are at the General Institute from June 20 to July 14 this year.