论文部分内容阅读
本文论证临江坝基设计中,根据坝基工程地质的实际情况,建基高程确定于弱风化岩石中、上部。因而节省了开挖量和混凝土填筑量。
This paper proves that in the design of Linjiang dam foundation, according to the actual conditions of dam foundation engineering geology, the foundation elevation is determined in the upper and middle weathered rocks. Thus saving the amount of excavation and concrete filling.