论文部分内容阅读
自从上一届铁路泥石流会议1981年10月在丹东召开以来,已经又经历了四个年头了。 1981年的会议正在成昆、两宝发生大规模灾害之后,严重的灾情唤起了各级领导部门和广大铁路工程技术人员对铁路上泥石流防灾问题的极大关注。当时,铁道学会孙家炽秘书长、部鉴定委员会沈之介主任、沈阳铁路局周希琪副局长以及铁道科学研究院副院长、工程
It has been another four years since the last railway debris flow conference was held in Dandong in October 1981. After the 1981 conference was going to be completed in Kunming, the serious disaster aroused great concern of the leading departments at all levels and the railway engineers and technicians on the disaster prevention and control of debris flows on the railway after the massive disaster in Bao and Bao. At that time, the Secretary-General of the Institute of Railways Sun Jiachi, Shen appointing Commission Director Shen, Shenyang Railway Bureau, Deputy Director Zhou Xiqi and vice president of Railway Science and Engineering, Engineering