法国赛利克公司受比利时埃泰克斯公司委托,为波兰一家屋面瓦厂设计长220m、宽10.28m的隧道窑。这是一座超大型隧道窑,但隧道窑的关键特性是窑的性能与创新元素。装配沙封的套管式隧道窑是法国赛利克公司最新的革新成果,一旦完成,它将是世界上最大的用H型窑具焙烧瓷砖的隧道窑。大约750块嵌板镶铸的部件船运到波兰,鉴于窑的尺寸较大,嵌板的机械强度多次用计算机建立数学模型计算确保它们的稳定性,尤其是在隧道窑的组装阶段。平均来说,每一天有38辆窑车进出隧道窑,在窑车上瓦和配件同时焙烧,确保色彩一致性和优化
France 赛 Lectra company commissioned by the Belgian company Entex, a roof tile factory in Poland designed 220m long, 10.28m wide tunnel kiln. This is a very large tunnel kiln, but the kiln’s key features are kiln performance and innovative elements. The sand-sealed casing tunnel kiln, the latest innovation by the French company Celique, will be the largest tunnel kiln in the world for firing ceramic tiles with H-shaped kilns. Approximately 750 panel-cast parts were shipped to Poland. Given the large size of the kiln, the mechanical strength of the panels was computed several times using computer calculations to ensure their stability, especially during the kiln’s assembly phase. On average, 38 kiln cars enter and leave the tunnel kiln each day, firing on the kiln car and accessories at the same time, ensuring color consistency and optimization