本刊1997年第2期刊登了《也谈简易支模一法》,对1995年第2期刊登的《简易支模一法》作了进一步的改进和完善。根据现场施工经验表明,此法仍存在对模板下炸跑模和挑砖因受模板压力而活动,开始布模不安全等问题。下面针对这些问题提出几点改进意见。1.钢筋卡子仍按改进后的样式尺寸不变,只是把卡子下口改成八字形,以使支模时能更容易卡拢模板(图1)。
In the 2nd issue of the Journal published in 1997, “Also talk about the simple form of a law,” the second issue of 1995 published in the “Simple form a law” made further improvements and improvements. According to the on-site construction experience, this method still has problems such as the fact that the template is blown to run and the brick is moved due to the pressure of the die plate, and the die is not safe. Here are some suggestions for improving these issues. 1. The reinforcing bar clamps are still unchanged in size according to the improved style, but the lower part of the clamp is changed to a figure eight shape so that the template can be more easily caught when the mold is clamped (Figure 1).