火车提速、微机加速、邮电快速……此起彼伏的时速大战,鞭策着现代人以更快的节奏和步伐追逐效率和效益的最大化。首钢总公司与连铸技术国家工程研究中心携手,追逐着工业发达国家在连铸机上不断兴起的提速浪潮,成功地将首钢第三炼钢厂2号和3号8机8流小方坯连铸机拉速从每分钟2.4m 提高到3.0~4.5m,最高达到5.2m,单流年产一举增加30%。全厂在仍保持年产245万 t 的规模下,生产成本下降1792万元。这项成果被冶金专家认定:国内领先,世界一流。它标志着中国的连铸生产进入高效化的新时期。
Train speed, computer acceleration, postal fast ... ... speed war after another, spur the modern people to chase faster and richest pace of efficiency and maximize efficiency. Shougang Corporation and the continuous casting technology National Engineering Research Center hand in hand, chasing the industrialized countries continue to rise in the continuous casting machine speed wave, the successful third Shougang No.3 and 8 8 8-flow billet company Casting machine pulling speed from 2.4m per minute increased to 3.0 ~ 4.5m, up to 5.2m, single-flow annual increase of 30%. The whole plant is still maintaining an annual output of 2.45 million t scale, the cost of production dropped 17.92 million yuan. This result has been affirmed by metallurgical experts: leading in the country and world-class. It marks a new period of efficient production of continuous casting in China.